Living & working

Freiburg-Vauban, Germany

"The Passive House Living + Working joint building project is a pioneering project in ecological construction. It was the first apartment block with a passive house standard in Germany."

This ecological pilot project is one of the first Baugruppe real estate projects in Vauban. With an energy efficiency that leads to a significant reduction in its ecological footprint, this 4 storey building ranks among the pioneer projects of “passive houses” in Germany. Open floor plans allow maximum flexibility in case of any change of use.

Figure ground plan
  • Status

    Completed in 1999

  • Client

    Baugruppe Wohnen & Arbeiten

  • Architecture

    COMMON & GIES ARCHITEKTEN

  • Engineers

    Fraunhofer-Institut für Solare Energiesysteme mit solares bauen GmbH, Freiburg (Energy consulting); Wolfgang Feth, Freiburg (Structure); Krebser und Freyler, Teningen (Building service); Jörg Lange, Freiburg (Sanitary concept)

  • Awards

    “Gelungene Siedlungen – attraktive Wohnquartiere – lebendige Nachbarschaft“, state of Baden-Württemberg

  • Photos

    Guido Kirsch / Pierre Gendron

  • Categories collective, material conscious, connected

"A high degree of individual design freedom."

Christine Falkner